06DR8200DC3600 6.5HP Carrier Compressor For Refrigeration Parts
Place of Origin | USA |
---|---|
Brand Name | Famous |
Certification | CE |
Model Number | 06DR8200DC3600 |
Minimum Order Quantity | 1 (pieces) |
Price | 1 - 9 pairs USD 1,445.00 >= 10 pairs USD 1,375.00 |
Packaging Details | Standard Packaging |
Delivery Time | Quantity (pairs) 1 - 1 2 - 10 > 10 Lead time (days) 15 20 To be negotiated |
Payment Terms | T/T, L/C |
Supply Ability | 10000 Piece/Pieces per Year |
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xCompressor Type | Semi-Hermetic | Cooling Capacity | 6.5HP |
---|---|---|---|
Voltage | 575V/208-230V/460V | Model | 06DR8200DC3600 |
Brand Name | Carlyle Carrier | Temperature | Low Temperature |
Refrigerant | R22/R404A/R407C | Warranty | 1 Year |
Machinery Test Report | Provided | Weight | 118kg |
High Light | 6.5HP Carrier Compressor,Refrigeration Carrier Compressor |
Carrier carlyle compressor 06DR8200DC3600 6.5HP carrier compressor supplier
Brand | Carrier | Horse power | 6.5HP |
Carlyle 06D/E semi-hermetic compressors are ideally suited for commercial refrigeration, air conditioning, process cool- ing, and environmental chambers. They are extremely flexible and may be used with many of the new HFC refrigerants such as R-507, R-404A, R-407C and R-134a, in addition to the conventional refrigerants (R-12, R-22, and R-502). The compressors may be operated at 50 or 60 hertz and are UL, CE, CSA, and ISO 9002 approved. Many of the prominent features of the 06D/E compressors are listed below.
NOTE when t0<-18,Carrier company suggests that motor should be cooled by motor fan
Selection Principles
1. Compressor capacity should be determined according to each evaporating temperature mechanical load multiplied by the total system operating time factor. In addition to special requirements, generally do not use the machine equipment.
Reciprocating piston compressors Freon
2. Selection, when the compression ratio is greater than 10 should be the two-stage compressor; Should be less than or equal to 10 single stage compression. Freon two-stage compression system generally should adopt a throttle in the middle of incomplete cooling.
3. Generally cold in some of the cooler, oil separators, condensers, liquid and other equipment should be with Freon refrigeration compressor cooling capacity to adapt.
4. Selection of Freon refrigeration compressors working conditions, working conditions shall not exceed the limit specified in Shenzhen cold storage companies.
5. Freon refrigeration cooling systems, heat recovery should be used in general circulation.
6. Refrigeration compressor operating hours, for 5 ~ 100t of cold, generally can be every day and night operation 12 ~ 16h.
Introduction
Shanghai KUB Refrigeration Equipment Co., Ltd. is refrigeration equipment production, refrigeration installation and technical services integrated enterprise. Our company was established in 2000. Since company's inception, we have been continuously innovating and developing. Our aim is to grow into the world's high-quality refrigeration equipment and accessories manufacturer in China.
Our main business are: the wholesale of foreign and domestic compressors and spare parts; production of all kinds of outdoor-type quiet refrigeration units and complete set of chillers, refrigerator library body, and refrigeration units; installation and commissioning one-stop services; production of condenser and evaporator.
We have subsidiary company - KUB Shanghai Refrigeration Equipment Co., Ltd. and the treasure house of the company's sales agent - Contardo Italian Air Coolers.
Our company's spirit is of "quality first, reputation first". We are trying our best to provide users with high-quality products and excellent services. We hope to work with the vast number of users and create a brilliant tomorrow together.
Q1: Are you a manufacturer or trading company?
A1:This compressor we are agent , But we are factories that produce condensing units, chillers,Evaporator.
Q2: What about the shipping methods?
A2: By express/By air/By sea.
Q3: What about the payment methods &payment terms
A3: We accept T/T ,Paypal, Western Union, Cash and etc.After 30% deposit,and 70%balance before the shipment.
Q4: What's your delivery time?Where is the loading port?
A4: Usually within 35-60 days after receiving the payment. Loading port:Shanghai,other place in china according your requirement.
Q5:Can I have a sample first ?
A5:You have to pay sample cost.
Q6: How do you ship the goods and how long does it take arrive?
A6: We usually ship goods by LCL or FCL by sea, by air or express delivery. Usually it takes 30 days by sea, 5-7 days by air or express delivery.
The delivery time is according to the way of shipping.